Detours in place during work on Houlihan Bridge closure - WTOC-TV: Savannah, Beaufort, SC, News, Weather & Sports

Detours set up during Houlihan Bridge closure

Posted: Updated:
Houlihan Bridge Houlihan Bridge
PORT WENTWORTH, GA (WTOC) -

The Georgia Department of Transportation has set up detours while its maintenance crew works on the James P. Houlihan Memorial Bridge.

The bridge is closed from 9 a.m. Monday to Friday, weather permitting.

Businesses, schools, and residents in the area will be accessible up to work zone. GA-25N/N Coastal Hwy will remain open to local traffic up to work zone.   

Detour routes:

Drivers heading north on GA-25 N/N Coastal Hwy will turn left onto Bonnybridge Rd:

  • Take the 1st right onto GA-21 N/​GA-30 W/​Augusta Rd
  • Turn right to merge onto I-95 N toward Florence Entering South Carolina; take exit 5 for US-17 toward US-321/​Hardeeville/​Estill
  • Keep right at the fork to continue toward US-17 S/​Whyte Hardee Blvd
  • Keep left at the fork, follow signs for US-17 S/​Savannah
  • Turn left onto US-17 S/​Whyte Hardee
  • Head south on US-17 S/​Speedway Blvd toward S Carolina 170 E/​State Rd S-27-84
  • Slight right onto S Carolina 170 W/​Alligator Alley and continue up to road closure

Drivers headed northwest on US-17 N/​Speedway Blvd toward Beech Hill Lane:

  • Continue to follow US-17 N
  • Turn left to merge onto I-95 S toward Jacksonville Entering Georgia
  • Take exit 109 for GA-21 S/​GA-30 E
  • Turn left onto GA-21 S/​GA-30 E/Augusta Rd
  • Turn left onto GA-30 E/Bonnybridge Rd
  • Turn left onto GA-25 N/N Coastal Hwy and continue up to road closure

Copyright 2013 WTOC. All rights reserved.

Powered by WorldNow