Glitch at Ports resolved, GA Hwy 25 open at Bonny Bridge Road - WTOC-TV: Savannah, Beaufort, SC, News, Weather & Sports

Glitch at Ports resolved, GA Hwy 25 open at Bonny Bridge Road

Posted: Updated:
PORT WENTWORTH, GA (WTOC) -

The gates at the Garden City Terminals of the Georgia Ports Authority are now fully functional after technology issues were resolved.

The road block on Georgia Highway 25 has been lifted at Bonny Bridge Road, and traffic is expected to resolve soon.

Traffic on GA 307 is still backed up but is expected to begin moving soon.

Please use caution in this area as delays are still expected.

 

Copyright 2014 WTOC. All rights reserved.

Powered by WorldNow